From: route@monster.com
Sent: Tuesday, August 23, 2016 12:35 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: osp engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Profile
Over 11 years experience in the engineering,
installation and maintenance of defense network systems. Strong points
include dedicated work ethics, sharp verbal communications and customer
relations, perceptive designer of telecommunication systems including voice,
data, structured cabling systems, access control, and intrusion detection.
Design, install, maintain, and inspect underground, buried and aerial copper
as well as fiber optic cables that support C4IS command, control,
communications, and computer information systems. Education
· *Application Approved to take BICSI RCDD (Registered
Communications Distribution Designer) Exam-Currently Studying* · ITS Design Fundamentals Certification-Bicsi License CEP
#0004261 · PIM/VSWR Certification(Andrews) License G585209US201S · FTTA(Fiber to the Antenna) Certification(Andrews) License
G585269US201S · Anritsu Site Master Line Sweep Certified License F16992K · OSHA 30HR Construction Safety License 5450_853341 · ETA Certified Fiber-Optics Installer License FOIOK194 · Communications Cable and Antenna Systems School, Sheppard
AFB, TX · Electronic Principles, Keesler AFB, MS · Tower Climbing Certified, 219th
Engineering Installation Squadron-Tulsa, OK · Pole Top Rescue Certified, 219th
Engineering Installation Squadron-Tulsa, OK · Confined Space Training, 219th
Engineering Installation Squadron-Tulsa, OK · Licensed Heavy Equipment Operator USAF · DOT(Department of Transportation) Physical-Expiration Date
12/29/2016 · Tower Worker RF Safety Awareness Training · AHA First Aid, CPR, AED Certified Cintas Corporation( TC#OH20246)
Expiration Date 01/26/2017 Skills
· In depth experience installing, designing, and managing
OSP Telecomm systems in residential, commercial, and defense markets · Seasoned Veteran with the ability to lead and manage teams
in austere environments · Comprehensive knowledge of RUS (Rural Utility Services),
National Electric Safety Code (NESC), BICSI standards, and military
specifications applicable to the contract · GPON, SPON, CCTV (surveillance), digital video, and access
control (card readers)-Design and Installation experience · Knowledge of computer software: ArcView 3GIS, Auto-CAD,
Microsoft Visio, Word, Excel, Power Point, and Outlook Experience
Envistacom
OSP Construction Site
Lead
September2015-Present
Location: Balad AB, Iraq
·
Supervise the construction of
SPON/GPON/ESS project consisting of the OSP infrastructure to over 50 guard
towers, 15 ITNS, NOC, ALT NOC, and 70 EBNs ·
Supervise the
construction/installation/certification of approx. 20 miles of SM FOC
creating 2 redundant FOC rings w/ diverse pathways connecting NOC and ALT NOC
creating hybrid PON Network ·
Manage over 60 multinational
Leads, Technicians, Engineers, Translators, Operators and Laborers ·
Assign daily/weekly/monthly
targets for multinational OSP teams, and track progression throughout project
· Work with local contracting companies building quality
relationships in order to create logistics solutions PEG Bandwidth
Sr. Fiber Splicer/Field Engineer
March2015-September2015 Locations: Texas, Louisiana, Mississippi, New York,
Pennsylvania, Ohio, Maryland, Delaware, Virginia
· Splice/Test fiber-over 150 sites to date in support of PEG
Bandwidths backhaul services for major wireless providers · QA/QC OSP infrastructure prior to site turn-up/OTDR test
Fiber Optic Cables prior to turn-up · Issue engineering change requests, remediate fiber
circuits to acceptable loss levels, red line as-builts throughout project
progression, field design OSP secondary infrastructure, document rack elevation
assignments for FDPs/Power Distribution/DWDMs/ALUs/Grounding Assemblies for
PE(principal engineer) ·
Complete Site Surveys and fiber
audits in order to build a FOC database Google Fiber operated by VistaCare
Communications UG & Aerial Crew Lead/Fiber Splicer/QA/QC
August2014-March2015
Locations: Provo, Utah & Kansas City,
Missouri · QA/QC Underground and Aerial Fiber infrastructure and
Network Access Points for Google’s FTTH(Fiber To The Home) program · Splice/troubleshoot/certify Fiber Optic Network making sure
all work is within specifications and to standard · Lead crews in underground construction to include
boring/plowing/trenching · Update tickets through Google’s NIU tool, and
search/troubleshoot through ArcView 3GIS ·
Quote OSP FTTH costs/ft/home for
Googles Vendor Manager using 3GIS measuring tool Envistacom
Engineer I
May2014-July2014
Location: Atlanta, Georgia · Review preliminary site surveys from Project Manager in
order to create LOMs (list of materials), and Telecommunication Systems
Design for Balad Air Base, Iraq ·
Prepare to deploy to Balad Air
Base, Iraq (due to danger with ISIS, Stop Work Order) Advanced Tower Integration
Services
Cell Site Test
Technician
January2014-March2014
Locations: New York, Vermont, and Virginia · Responsible for UMTS, GSM, and LTE line/antenna/full
system sweeps, carrier adds, and troubleshooting · Performed all fiber optic/antenna/transmission line pre
and post install testing for close out packages ·
Installed BBUs(Battery Backup
Units), RRUs(Remote Radio Heads), TMAs(Tower Mounted Amplifiers), diplexers
and cabinets for DAS(Distributed Antenna Systems) General Dynamics IT Fiber
Splicer/Operator/Field Engineer
July2011-November2013
Location: Camp Bastion/Leatherneck, Helmand
Province, Afghanistan & FOB Shindand, Herat Province, AFG · Document, plan, modify and install OSP & ISP
communications infrastructure · Responsible for leading a crew to ensure that each project
conformed to standards which meet industry quality and safety ITT Systems
OSP/ISP Technician II/ Interim Site Lead
August2010-July2011
Locations: Transit Center at Manas, Kyrgyzstan
& Camp Bastion-Helmand Province, Afghanistan · Responsible for the Design of OSP/ISP Telecommunication
Systems to include Distribution Nodes (ADNs, ITNs) · Designed communication manholes to be submitted to local
contractor to build · Built tool and material lists for future current and
future E&I projects · Calculated weekly/monthly reports through Microsoft Excel
to be submitted to AFCENT · Made recommendations to Air Force Comm. Agencies improving
network operability and sustainment · Coordinate with sub-contractors in order to obtain quotes,
reduce costs, correct engineering and equipment issues · Assisted E&I team in installation of multiple Whelen
Giant Voice Systems- Manas, Kyrgyzstan ITT Systems
OSP/ISP Engineering & Installation
Technician
June2010-August2010
Location: Al Udeid Air Base, Qatar · Designed and Installed copper/fiber optic OSP Networks for
DOD · Built weekly cut sheets for technicians for copper and
fiber splicing · Verified that test results of network cabling were within
limitations prior to turnover and acceptance by customer General Dynamics IT
Military Communications Systems
Installer
March2008-March2009
Location: Al Asad Air Field, Iraq · Installed Fiber Ring for Al Asad Air Field which led to
commercialization of Telecommunication Network · Assist in communication manhole/conduit design &
installation to include racks, steps, and grounding · Built weekly cut sheets for Fiber/Copper splicing to be
handed out to technicians · Designed and Installed racks, enclosures, and grounding
into TRs, ERs, and Distribution nodes · Verify and document that test results, and grounding are
within limitations prior to customer turnover CRSMillwright
April2007-March2008
Locations: Commerce, CA & Oakdale, CA · Installed food production lines for Contessa Foods in
Commerce, CA · Anchored all-thread to graded concrete to provide optimal
placement of hoppers, conveyers, and elevators in order for production line
to operate effectively · Spliced and terminated low voltage switches, emergency
stops, and control panels for production line · Rigged equipment with shackles and rigging straps to pick
and place in line resulting in zero damage to equipment or persons involved · Disassembled and shipped production lines at a Hershey
factory in Oakdale, CA · Built Border Customs forms for shipment to Mexico · Created digital and paper copies of equipment serial
numbers and photos in preparation for shipment to Mexico · Recorded weight, quantity of items, and description of
items on each pallet to be shipped USAF 219th Engineering
Installation Squadron-Tulsa, OK
December2004-December2010
Communications Cable & Antenna Systems
Journeyman -Bagram
Air Field,
Afghanistan
November2006-January2007 · Assisted Air Force engineer in design and installation of
Main Distribution Frame (MDF), backbone and horizontal cabling, TRs and
grounding · Provided communications systems to F15 support buildings
in support of Operation Iraqi Freedom -Ali Al
Salem,
Kuwait
October2006-November2006 · Performed site survey, planned and acquired best location
for multiple Whelen mono-pole Giant Voice Systems · Populated base with inter-duct for future E&I projects -Sheppard
AFB, TX
June2006-August2006 · Performed (PMIs) preventative maintenance inspections on
antenna poles, cables and hardware · Replaced corroded hardware and mounted new Antennas -Patrick
AFB,
FL
March2006-June2006 · Disassembled/assembled 60 ft Radar tower to repair
excessive salt water damage to structure · Operated Lo-Pro vehicle to wench angle-iron into mounting
position · Climbed tower following safety guidelines and requirements
to conduct (PMI) · Mounted approx. 50 ft of waveguide through center of
tower; to include grounding of tower and radar equipment · This project resulted in saving the Air Force the cost of
a new radar tower -Hickam
AFB,
HI
January2006-February2006 · Installed Max-cell and mule tape to provide redundant
network fiber backbone · Surveyed OSP manhole system to provide accurate
documentation for future E & I projects -Camp
Gruber Army National Guard Base,
OK
November2005-December2005 · Designed and installed multiple OSP runs approximately 2
miles in length · Placed manholes every 450 ft.; to include installation of
racks, ladders, and grounding assembly · Installed SM Fiber Optic cables to multiple PTZ cameras
throughout base · Designed “Build Out” of communication closet to install
DVRs, UPS, fiber splice enclosures, and grounding · Tested and Certified all installed media with Fluke OTDR
and power meter -Cable/Antenna
Systems Training Sheppard AFB, TX
May2005-October2005 · Design, install, maintain, remove and modify copper core,
coaxial, waveguide, fiber optic and antenna systems · Climb antenna support structures (wooden poles and towers)
for maintenance and installation of cable/antenna systems · Install and maintain LAN and WAN media distribution
systems-OSP & ISP · Use drawings, task lists, instructions and technical data
(TOs) to work on copper core, coaxial, waveguide, fiber optic cable and
antenna systems · Terminate copper core and fiber optic cables on main
distribution frames and interface equipment · Operate and perform maintenance on tools, test equipment,
auxiliary equipment and vehicles such as backhoes, trenchers, cable trailers,
cable reel trucks and antenna construction vehicles · Locate, repair and replace faulty enclosures in copper
core, waveguide, coaxial, and fiber optic cable systems · Install, maintain and mark paths of buried cable systems -Electronic
Principles Training Keesler AFB,
MS
March2005-April2005 · AC and DC principles training **References
available upon request
1 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|